Blog

Renovation progress at Harlau House

Renovation progress at Harlau House

The installation of the steel beams.

renovations with Maree from Maree Hynes Interiors
Exterior renovations with Maree Hynes Interiors
The renovation of Harlau House is taking shape with the majority of the grunt work having been executed by the team @lonepinebuilding .
As the images suggest, the steel has all been installed and the opening has now been made in the external wall. Allowing for a beautiful flow from the yet to be installed kitchen right through to the handsome fire place. 
Along each side of the build there are floor to ceiling windows and we look forward to bringing you images of these being installed in our next update. 
Overhead, the trusses have now been installed and since these images have been take the roof is now installed. 
Maree from Maree Hynes Interiors along with her husband Michael have been living on-site during these renovations. As difficult as it is to live on-site with such a substantial build, the upside is that Maree and Michael have been able to manage this project at every stage.
 
We look forward to bringing you another update shortly.
 
Maree.